Anonymised project examples from critical IT initiatives.

Case studies from real projects

Selected engagements from more than 20 major projects — anonymised, with proven results.

Filter by topic
Project Rescue

A failed compliance migration of external partner access, rescued

Pharma Project Manager 2016–2017
400 → 1,900

accounts migrated – the rescued project led to some 1,500 more.

Situation

A global compliance initiative to secure external partner access had stalled: two migration attempts had already failed, the deadline had slipped for a second time, and the partners' trust was gone. Three months were left for the rescue.

My intervention

I built a reliable, controllable migration service, drove urgency with the internal technical teams, set up a realistic test environment with user acceptance testing, and ran proactive stakeholder management with an open communication plan. Through individual pilot migrations I gradually rebuilt the partners' trust.

Result

The 400 accounts were migrated on time. The success led to follow-on orders for around 1,500 further accounts – with high client satisfaction.

Project Rescue

A CRM master-data provider switch, stabilised

Pharma Senior Project Manager / PMO 2017–2018
9 months behind

made up – go-live on schedule and on budget.

Situation

A CRM system was to be connected to a new master-data provider as a big-bang – with no rollback option. The project was nine months behind, the go-live had been postponed twice, the team was divided, the previous project manager was non-technical and inexperienced, and the affected departments were resisting.

My intervention

Three levers: strengthen management support, break down user resistance, and forge a high-performing team around a shared vision. Delivered through a kickoff and regular steering reporting, active change management (info sessions, interviews, open-door) and bringing the core team together with six subject-matter experts in one place – alongside mentoring the inexperienced project manager.

Result

The go-live landed on schedule and on budget. Users and the team gave notably positive feedback.

IT Strategy

A global project-management methodology introduced in a regulated environment

Life Sciences Consultant / PMO 2018
16 IT PMs

trained – methodology embedded in the internal training programme.

Situation

A fast-growing company ran IT projects with no common method – everyone in their own way. That caused rework and, increasingly, problems from missing alignment. At the same time, new GMP processes had to be integrated compliantly.

My intervention

Captured the existing approaches, adapted the PMI methodology to the organisation, integrated the GMP processes, and developed and delivered a two-day training programme including materials.

Result

16 IT staff completed the initial training; the course was adopted into the internal training programme for new project managers. Transparency, control and documentation of IT projects improved for good.

Project Leadership

A Switzerland-wide client migration of 2,500 machines during live operations

Telecommunications Overall Project Manager 2012–2015
2,500 clients

migrated – with no operational downtime and no data loss.

Situation

Around 2,500 machines were to be migrated to a new operating system across Switzerland, some with hardware replacement – with no noticeable downtime and no data loss. The internal attempt had failed on time, know-how and lack of user cooperation; the external team was initially seen as the 'enemy'.

My intervention

Steering across several work streams (client, application, rollout, communication, change) and leading a twelve-person team of internal, external and offshore members. Built a tool-supported, semi-automated rollout and migration procedure with local data backup, plus reference cards, drop-in training and service-desk training. I broke down resistance through many one-on-one conversations and gradual, team-by-team migration.

Result

Successful completion including handover to operations. High client satisfaction led to several follow-on projects.

Portfolio & PMO

Multi-project management and mentoring in a regulated environment

Pharma Multi-Project Manager 2018–2020
6 project leads

mentored, 4 validation-relevant projects steered.

Situation

Several IT projects had to be steered in parallel in a regulated environment – through risk assessments, validation activities and supplier coordination, with active change management and regular reporting to sponsors.

My intervention

Introduced a defined organisational change management and regular sponsor reporting, steered internal customers through several risk assessments and validation steps, and led and mentored six business project leads from different departments.

Result

Four validation-relevant projects were guided through the validation processes in a structured way and successfully handed over to operations.

IT Strategy

A service landscape streamlined, service costs cut by around 20%

Pharma Service / Project Manager 2022
~20%

lower service costs across three service units.

Situation

Across three units, redundancies in the service landscape were to be removed and running costs reduced – while addressing service-related risks in a structured way.

My intervention

Ran a service-landscape review with service optimisation and risk assessments, supported application owners and service managers with compliance-relevant system risk assessments, and maintained the service-management system.

Result

Around 20% savings in service costs and an optimised service offering across three service units.

Project Leadership

A pre-project for a five-year programme to replace a legacy system

Pharma Project / Programme Manager 2023
~1,500 users

target scale of the replacement – pre-project set up on solid ground.

Situation

A 15-year-old system with around 1,500 users was to be replaced by a future-proof solution. In the pre-project, the goal, approach and collaboration had to be set up on solid ground, and the team's hybrid way of working adapted to its maturity.

My intervention

Set up and steered the pre-project together with the internal project manager: meeting facilitation, status reporting, risk-register upkeep, continuous adaptation of the hybrid way of working, and planning and running on-site workshops with up to 30 participants.

Result

The pre-project delivered the basis for the software evaluation and the selection of a suitable service partner – a solid start into the multi-year programme.

Portfolio & PMO

PMO for an MES integration in a regulated production environment

Pharma PMO 2024–2025
Risk & reporting

a continuous process and automated reporting established.

Situation

Two production project leads in an MES integration environment needed PMO support – focused on risk management, reporting and compliance-relevant documentation flows that had to be steered continuously and in a structured way.

My intervention

Set up and monitored a continuous risk-management process, implemented regular automated reporting, prepared and facilitated the steering-committee meetings, and validated test documents in the validation tool.

Result

A continuous risk-management process and automated reporting were permanently in place and strengthened the project's steerability.

Portfolio & PMO

An annual IT portfolio built and prioritised ready for decisions

Pharma PMO 2018
~20 projects

assessed and prioritised for the annual portfolio.

Situation

For the annual IT portfolio, project requests from various business areas had to be made comparable, checked for feasibility and viability, prioritised and presented clearly.

My intervention

Collected and prepared the requests, validated the business cases including an ROI view, prioritised the initiatives, and produced a clear visual portfolio overview and draft plan.

Result

A decision-ready, visual overview of around 20 projects for the coming year – a solid basis for the IT leadership's portfolio decisions.

All examples are deliberately anonymised; I share clients and details confidentially, in person.

Do you recognise your situation in one of these cases?

No two projects are alike — but the patterns repeat. In a no-obligation first call, I assess your situation:

  • Assess your starting point honestly.
  • Name the most effective levers.
  • Suggest a concrete next step.
I'm Stefan Vesenmeier Stefan Vesenmeier

Tell me briefly about your situation, and I'll tell you plainly where I'd start — and whether I'm the right fit.

Request a Consultation

Not ready yet? Connect on LinkedIn and stay in touch without obligation.